Battery Storage
Hi Line Storage Facility
Williamson County, TX
Advanced PlanningProject Overview
A 100MW / 400MWh battery energy storage system (BESS) designed to stabilize the Central Texas grid during peak demand.
As Texas continues to grow, energy storage becomes vital. This facility allows for the capture of excess solar and wind energy, releasing it when the grid needs it most, ensuring Texas keeps the lights on.
Community Benefits
Enhanced grid reliability for local residents
High tax-base value on a small land footprint
No noise, no emissions, and no traffic during operation
Critical infrastructure for future renewable growth
Project Location
Detailed location map is available for verified stakeholders.
Pecos County Regional Area
Interested in this project?
Whether you are a neighbor, a community member, or a landowner, we want to hear from you.
Fact Sheet
Download the project summary and community impact report.